Team B1:
- Continued to develop and create different levels of the platform game.
- Completed retouching and final details of the background.
- Platform game is ready for integration with the other teams.
- Completion of mini-game creation.
- Developed instructions for the game.
- Wrote about the purpose and goal of the game for the Design Manual.
- Created an outline for the lab poster.
- Added construction theme components to the mini-game background.
- Completion of the mini-game "shape Memorization".
- Distributed work of the Final Report and Design Manual.
- Completed final design of programs.
- Completed testing of programs.
- Met to discuss compilation of final product.
- Prepared outline of final report.
- Redefined Functional Requirements based on feedback from the report.
- Completed playable version of the mini-game.
- Created an outline for the lab poster.
- Finished first organisation mini-game.
- second game is nearly complete.
- Sprites are implemented and theme is integrated.
- Final report divided among group members.

The Gantt Chart above effectively outlines the tasks accomplished to date which are represented by check marks as well as tasks which are still in progress which are represented with the black indicator bar.
TO BE ACCOMPLISHED NEXT WEEK:
Team B1:
Team B1:
- Complete integrate game and test it.
- Complete design manual.
- Complete the Design Manual.
- Create the lab poster.
- Complete the final report.
- Prepare for the Open House.
- Finish the Design Manual and Final Report.
- Practice the presentation speech.
- Submit contribution to Design Manual.
- Organize and prepare presentation of design prototype.
- Complete Final Report.
- Testing and modification of mini-game.
- Writing and editing of Final Report.
- Finish second mini-game.
- Prepare for the Open House.
- Sarah and Tamara will be designing and creating the lab poster for the Open House.
- Niko and Asad, Mihai and Christian will be doing the presentation at the Open House.