ACCOMPLISHED THIS WEEK
Programming
- A prototype for each section of every groups game has been completed
- Set specific deadlines for the completion of the game (i.e. April 8th)
- Discussed how the game would be shown at the Open House
- Assigned a member to be in charge of integrating the entire game into an integrated package
- Meeting was held to discuss how things are proceeding
- Poster initial design has been completed
- Design Manual has been assigned out to a member to take charge of the graphics
- Meeting was held to discuss the new tasks assigned
- Work packages were made within the group
- Final touch-up completed for created sprites for the game
- All questions for all parts of the game were completed
- Research has been done on the necessary contents of the Design Manual
- Research has been done on the necessary contents of the Poster
- Discussed how the Open House will take place
- Discussed the roles of those presenting the Open House
MONITORING AND CONTROL
Below represents the lab's progress compared to the initial plan
Figure 1- Week 4 Status

TO BE ACCOMPLISHED NEXT WEEK
Programming
Programming
- All final touch-up's must be made to each groups game
- All components of each game must be sent to the member assigned to integrate them all into one single game by April 8th.
- Information on the programs created must be written down for the Design Manual
- Poster must begin to be created
- Design Manual creation will be started
- Poster information will be collected for the game
- Graphs will be found as visual representations for the game for the poster
- Information will be gathered for the Design Manual
- Work packages will be assigned for the remaining tasks
- Testing will begin on the game